|
| |
- On stream
hydrograph time interval between center of mass of
precipitation and center of mass of resulting
flood.
Source: Leet, L. Don. 1982.
Physical Geology, 6th Edition. Englewood Cliffs, NJ: Prentice-Hall
- The total time between the initial application of current and the rupture
of the circuit within the detonator. BS, 12
Source:
Dictionary of Mining, Mineral, and Related Terms
| |
|