|
|
|
|
S. Afr. The calculated value of ore before crushing. After treatment,
there remains a residue of the valuable metal in the sands, slimes, or
tailings, which, added to the yield obtained by treatment, should be equal
to the mill value. Beerman
|
|
About Us DeveloDex™ OptiMall™ Success Tools Tabularium™ WebRef™
|